| Drawing No. |
Drawing Title |
PDF |
DWG |
| 70-10-01-2009 |
Renovation of an Exposed Warm Roof |
pdf |
dwg |
| 70-10-02-2009 |
Renovation of an Exposed Roof Ventilated Wooden Deck |
pdf |
dwg |
| 70-10-03-2009 |
Renovation of an Sloped Warm Roof |
pdf |
dwg |
| 70-10-04-2009 |
Renovation of an Exposed Warm Roof with Additional Insulation |
pdf |
dwg |
| 70-15-01-2009 |
Renovation Gravel Ballasted Roof |
pdf |
dwg |
| 70-20-01-2009 |
Renovation Pedestrian Deck |
pdf |
dwg |
| 70-20-02-2009 |
Renovation of a Pedestrian Deck Duo Construction |
pdf |
dwg |
| 70-25-01-2009 |
Upstand Termination Behind Cladding Wall |
pdf |
dwg |
| 70-25-02-2009 |
Parapet with Secret Fix Pocket + Low Wall Termination Detail |
pdf |
dwg |
| 70-25-03-2009 |
Parapet Detail with Protan Secret Fix Strip |
pdf |
dwg |
| 70-30-01-2009 |
Installation of New Outlet with Factory Welded Membrane |
pdf |
dwg |
| 70-30-02-2009 |
Renovation of Existing Outlet with Clamp Ring |
pdf |
dwg |
| 70-30-03-2009 |
Pipe Flashing Continuous |
pdf |
dwg |
| 70-35-01-2009 |
Transition Tie to Bitumen Roof |
pdf |
dwg |
| 70-35-02-2009 |
Temporary Tie to Bitumen Roof |
pdf |
dwg |
| 70-45-01-2009 |
Vacuum Roof with Aditional Insulation |
pdf |
dwg |
| 70-45-02-2009 |
Wacuum Roof |
pdf |
dwg |
| 70-45-03-2009 |
Vacuum Room Outlet Detail |
pdf |
dwg |
| 70-50-01-2009 |
Old Metal Roof with Standing Seam |
pdf |
dwg |