In the traditional overlap system, the membrane is fixed to the base within its side lap and overlapped by the adjacent sheet. The two sheets are then welded together using semi automated hot air welding equipment. This guarantees a homogenous seam, which is of greater strength than the membrane. Minor works are carried out using hand held hot air welding equipment.

